Tom’s River to Agualta Vale Road Rehabilitation

 

Tom’s River to Agualta Vale Road Rehabilitation
Introduction
In 2008 the Government of Jamaica engaged the services of DIWI Consultant International GmbH to carry out re-design of the roadway between Tom’s River and Agualta Vale in St. Mary.
The design was completed in early 2009. This project involves the rehabilitation of approximately 18 kilometres of road and appurtenances between Tom’s River and Agualta Vale. The roadway will have a design life of twenty (20) years.
Scope of Works
The scope of works includes the following:
a)      Roadwork’s
Approximately 18 kilometres of paved two-lane carriageway, 7.3 metres wide with paved shoulders where possible. Alternative to shoulders will be sidewalks where possible.
b)      Drainage
All existing pipe and box culverts will be replaced or improved and new ones added in order to provide adequate drainage. Approximately 77 new culverts, 120 auxiliary drains and 15 kilometres of side drains will be installed.
 
c)      Safety
Curve widening, cat’s eye on the roadway, luminous road markings, reflective road signs, reflective markers on guard rails and pedestrian crossings. Environmental mitigation measures will also be employed.
d)      Paved Shoulders
Paved shoulders will be constructed for non-motorised road users. Information signs will be installed and bus shelters constructed.   
         Preparatory Works
        The Government of Jamaica is now in the process to provide “clear and unrestricted
        access” along the corridor.
        This includes:
ü Acquisition of all necessary lands
ü Resettlement of the affected population
ü Relocation of affected utilities
Achievements to date
Substantially completed the identification of affected parcels (350).
Tenders for Land Acquisition Surveying were returned in December 2009.
Land Acquisition is scheduled for completion in December 2010.
The six contract packages were signed during the months of March and April 2010.
The table below provides details on progress up to June 2010.

Contract Package
Location
Date of Signing
Progress
Package 1
Tom’s River - Castleton
March 22, 2010
30%
Package 2
Castleton – Grandy Hole
April 16, 2010
15%
Package 3
Grandy Hole Devon Pen
April 16, 2010
25%
Package 4
Devon Pen - Broadgate
March 23, 2010
25%
Package 5
Broadgate - Georgia
April 22, 2010
15%
Package 6
Georgia – Agualta Vale
April 22, 2010
15%

customer complaints | feedback | site map | contact us 
Copyright ©2007 National Works Agency, 140 Maxfield Avenue, Kgn. 10, Ja. W.I.
Telephone: One Road (663-7623) / 926-3210-9 Fax: 906-9919
Designed by: NWA Web Development Team