Section of the Danks to Chapelton Main Road in Clarendon Now Closed

Date Published: 
29 Nov 2024

 

The National Works Agency (NWA) is advising that the roadway in the community of Cross Roads, along the Danks to Chapelton main road in Clarendon, is closed with immediate effect. The closure is due a failure of the corridor as a result of an earthquake earlier this month and subsequent rainfall which caused further deterioration.

According to the NWA, soil movements were confirmed following an earthquake on November 10. Continuous rainfall in the last two and a half weeks further destabilised the area making it unsafe for general use by motor vehicles.

There are two alternative routes available to motorists, with one only suitable for small vehicles. The recommended route for small vehicles is through Hyman Street, located in the general vicinity of the affected road section. Larger vehicles coming from the direction of May Pen should turn left at Coco Piece, continue through Wood Hall, then Mount Providence to New Ground, turn right and head towards Summerfield. The reverse will obtain for motorists travelling from the direction of Summerfield.

 

Motorists are being urged to proceed with caution and to obey posted warning signs.

FAQs